
Location
Dubai
Duration
2022 — Active
This project required a versatile MEP approach to handle the differing power and water demands of retail and residential tenants. Working with ECO Green Consultants, we focused on sustainable engineering to ensure low operational costs for the building owner.
Total Floors
4G+3
Project Category
100Mixed-Use
The Challenges
- Diverse commercial load requirements.
- Compact Karama plot logistics.
- Strict green building compliance.
Our Solutions
- Customized retail power panels.
- Optimized rooftop equipment layout.
- Sustainable material procurement strategy.

