
Location
Dubai
Duration
2024 — Active
Partnering with Strong Walls Construction and Al Gafry Consulting, Karnafuly delivered a complete MEP package designed for high-density urban usage. The project involved installing high-performance electrical systems and specialized fire safety protocols to meet the specific requirements of the Karama district’s commercial-residential codes.
Development Level
4G+3
Location Class
1Prime Karama
The Challenges
- Urban plot logistics management.
- High-density power load balancing.
- Complex fire safety integration.
Our Solutions
- Just-in-time material delivery strategy.
- Just-in-time material delivery strategy.
- Automated fire alarm synchronization.

